As per the Department of Public Works and Highways, Philippines, San Pedro Bridge will be closed on September 5 (Tuesday) 9PM, and will be opened the next day September 6 (Wednesday) 5AM. The contractor will be pouring concrete on the girder.
The post DPWH RELEASES SAN PEDRO BRIDGE CLOSURE SCHEDULE FOR SEP. 5 – 6, 2017 appeared first on .